Ski Resorts News
11/26/2018
We’re reaching out just before the winter season as the first snowflakes touch the valley floor with news from Saalbach Hinterglemm, Leogang and Fieberbrunn. Winter sports fanatics have plenty to look forward to, including new lifts, cool events, even more comfort than before and a real XXL winter.
From the centre to the mountain with zero waiting time
“Goodbye Kohlmaisbahn” — this was our farewell to our historic and believed fire-red group lift that used to take us to Saalbach’s Kohlmais mountain. The work continued throughout the summer and within just a few months, construction — which had already started in summer 2017 — was completed. The model is called “Omega V” and offers top-notch comfort. Ten persons can easily and comfortably fit into this newest generation of gondolas by the company Doppelmayr and, thanks to the ergonomic single-seats and the well thought out ventilation system, gondola riding is actually made quite charming. Comfort is provided from the moment you hop on. From the Skiliftstrasse, elevators take you straight to the entrance and the ticket offices. And the new lift is super-fast, too: Starting in December, an unbelievable 3200 people per hour will be transported with the new Kohlmaisbahn.

8 is the new 6
8 people fit into the new Asitzmuldenbahn lift in Leogang. In the summer, the old 6-seated chairlift was sent into retirement and replaced with a new and much more powerful lift. Instead of the previous 2400, now 3500 people can comfortably make their way up to the Kleiner Asitz peak from the Asitzmulde hollow within an hour — the waiting times associated with this bottleneck are thus history. Thanks to the automatic restraining bar, the ride with the lift turns into a safe and exciting experience, especially for families with children. Incidentally, the new valley station was moved by around 55 metres. As a result, the slope can now be safely crossed from the Sportbahn Asitzkogel and the Asitzmuldenbahn to arrive at the valley station.Technical Data Asitzmuldenbahn:
- Transport capacity 3.500 P/h
- Travel speed 6 m/s
- Vehicle capacity 8
- Hight difference 199 m
- Inclined length 573 m
- Travel time aprox. 1,5 min
Reservoir update
During summer, they are a true asset for the surrounding landscape: The reservoir lakes, harmoniously embedded into the mountainscape. In the winter, they are indispensable for the snow-making systems, as only artificial snow made from pure water mixed with cold air makes its way onto the slopes of the Skicircus. This means even more snowfall certainty around the Hochalm mountain pasture. The two existing reservoir ponds in the Streuböden area in Fieberbrunn were also expanded. The volume of the lake was increased by nearly tenfold. This reservoir pond supplies all of Streuböden, Maiskopf and Doischberg and guarantees skiing operations during Christmas.Latest Resort News
Helmissimo: A New 10-Seater Gondola Set to Transform the 3 Zinnen Dolomites Ski Area
The 3 Zinnen Dolomites ski area in South Tyrol, Italy, is preparing for a major infrastructure upgrade ahead of the 2026/2027 winter season. The new HELMISSIMO 10-seater premium gondola in Versciaco will bring faster access to Monte Elmo (Helm), increase lift capacity and improve the overall skiing experience.
11/06/2026
La Clusaz Unveils New Six-Seater Balme Chairlift for the 2026–2027 Ski Season
La Clusaz, one of the most popular ski resorts in the French Alps, is preparing a major upgrade to its mountain infrastructure with the installation of a brand-new six-seater detachable chairlift in the iconic Balme sector. The new lift, built by French manufacturer POMA, is set to transform access to one of the resort's most spectacular high-altitude skiing areas for the 2026–2027 winter season.
11/04/2026
L’Alpe du Grand Serre Saved: 30-Year Deal and Investment
L’Alpe du Grand Serre, one of the oldest ski resorts in the French Alps, has been saved from permanent closure after signing a 30-year operating agreement with SATA Group. The deal, signed on 30 September 2026, secures the resort’s long-term future and paves the way for its reopening on 19 December 2026. With investments of up to €17 million planned, the resort near Grenoble is preparing for a new chapter in its history.
11/03/2026